Last month we took the hull of the 17m carbon motorboat out of the mould. The casco has been moved to the middle of the workshop, cause there is more room to go up. Subsequently the Flybridge was placed on a construction frame on top of the ship.
Very impressive, the beautiful lines of the Guide De Groot design are all coming together now. Scroll trough the pictures to see how this day was.